Groete Gold Copper Deposit
Flagship Asset

Groete Gold Copper Project

Essequibo, Guyana

Explore Asset →
Groete
Gold Copper Project
100%
Owned
2027
Permits Secured Through
Ready
For 2026 Drilling

Exploration Strategy

Improving a Known Resource and Drill Testing New Areas

A focused 35-hole drill program targeting areas of higher gold grade within our inferred resource

Eastern Surface Gold Zone

  • Eastern surface gold zone — high priority exploration target
  • East west trending shear hosted gold deposit with 4 km of strike
  • Only 1 km of strike drill tested — significant expansion potential
  • 35-hole drill program to upgrade current inferred resource and potentially expand total ounces

New Resource Calculation for 2026

  • Establish new NI 43-101 Mineral Resource including potentially higher grade areas
  • Potentially upgrade inferred resource to measured and indicated
  • Advance metallurgical process test work to define optimized recovery protocol
  • Preliminary Economic Assessment (PEA) anticipated for 2026-27
East Zone Target Area

Historic Validation

Guyana: Home to Some of the World's Largest Gold Deposits

Groete Gold Copper Deposit

Gold Port's wholly owned Groete Gold Project has an extensive exploration history. Drilled by the United Nations in the 1960s and Coeur d'Alene Mines Ltd. in the 1990s, the project has emerged as one of Guyana's largest gold copper zones, and the only deposit with deep water access.

Current Resource Estimate

1.57 million gold equivalent ounces within 74 million tonnes at a grade of 0.66 g/t AuEq using a cut-off grade of 0.25 g/t, based on $US1,275.00 per ounce gold and $US3.00 per pound copper prices.

Details from National Instrument 43-101 report titled Technical Report and Updated Mineral Resource Estimate on the Groete Gold Copper Deposit by P&E Mining Consultants Ltd., dated April 16, 2019.

2026 Exploration Program

2026 Program

Exploration & Development Strategy

35-Hole Core Program

8,100 meters targeting areas of higher gold grade in eastern zone to revalue deposit quality.

Metallurgical Testing

SGS Canada testing new leaching reagents and alternatives to cyanide processing.

New Resource Estimate

Establish new Indicated Mineral Resource calculation to demonstrate higher grade continuity.

PEA Study

Preliminary Economic Assessment anticipated for 2027 to define project parameters.

Strategic Advantage

A Major Gold Deposit Close to Infrastructure

Location & Accessibility

The Groete Project benefits from exceptional infrastructure positioning in Guyana.

  • 30 kilometers from port city of Bartica
  • 65 kilometers from capital, Georgetown
  • Direct access to Essequibo River — major transportation route
  • Most accessible major resource in Guyana with only short access to deep water

New Equipment on Site

Multi-Power Discovery One core rig with state-of-the-art track-mounted drilling system.

  • Designed specifically for Guyana exploration environment
  • Full supply of drilling accessories
  • Complete field support logistics
  • Ready for program commencement

Site Preparation Complete

All necessary infrastructure and equipment staged for immediate drilling operations.

  • New access road under construction
  • Heavy equipment refurbished and on site
  • Support structures purchased and positioned
  • Camp and drill rig ready for program
Strategic Location Map
Staged & Ready

Exploration Results

Geoprobe Surface Evaluation

Comprehensive surface evaluation completed on eastern zone with new zones of interest identified

Surface Evaluation Results

Comprehensive surface evaluation completed on eastern zone with new zones of interest identified:

  • 52 deep soil holes up to 8.75 meters in depth
  • Significant results: Up to 2.65 g/t gold over 8.75 meters (surface down)
  • 47 of 52 holes anomalous for gold (over 0.10 g/t)
  • 23 holes greater than 0.50 g/t gold average

In Situ Potential (from P&E Mining 2022 evaluation):
15 to 21 million tonnes with gold grade between 0.90 and 1.40 grams per tonne

Exploration Results

Investment Case

The Gold Port Value Proposition

A drill-defined, world-class gold copper resource with exceptional upside potential in a tier-1 jurisdiction

Drill Defined Resource

A drill defined gold inferred resource calculated at $US1,275.00 per ounce Au — providing a solid foundation for resource expansion and development.

Excellent Upside Potential

Significant upside for a larger resource with only 1 km of the 4 km strike of the eastern zone drill tested to date.

Potential for Grade Improvement

Potential for grade improvement through focused exploration targeting higher-grade zones identified in the eastern surface gold zone.

Excellent Location for Development

Excellent location for future development with only 30 km from port city of Bartica and direct access to Essequibo River for deep-water logistics.

Mining Friendly Jurisdiction

Located in Guyana, a tier-1 mining jurisdiction with English law framework and proven support for responsible gold resource development.

Interactive 3D Model

View our impressive 3D project model to visualize the deposit geometry, mineralization zones, and development potential of the Groete Gold Copper Project.

2026 Catalysts

Drill program to confirm higher-grade zones, new resource estimate, metallurgical testing, and PEA completion — multiple value creation events anticipated.

Exploration Upside

Deposit open in all directions. Eastern zone shows 15-21M tonnes at 0.90-1.40 g/t gold. Multiple untested targets remain. Significant resource expansion potential.

Background

Ready to Learn More?

Request our comprehensive investor package with technical reports, financial details, and management information.

Request Investor Package →

Get more information.

Join our INVESTOR ALERT list.